BW Controls

Case Study:

Design & Build of Control Panels for Xylem, for United Utilities Adoption

At BW Controls, we specialise in creating control panels that meet stringent regulatory standards for adoption by major utility companies. Our collaboration with Xylem, a leader in water technology solutions, highlights our capability in delivering compliant, high-quality solutions for the construction sector.

In large residential housing developments, property developers aim to transfer the responsibility of critical infrastructure, such as sewage pumping stations, to utility companies. This requires the infrastructure to meet rigorous standards like ‘Sewers for Adoption,’ and this includes the electronic controls used to monitor and operate these systems.

We partner with Xylem to design and build control panels tailored for these specific applications. Our expertise in creating off-site built, statutory compliant solutions ensures that the control panels not only meet but exceeded the required standards. This makes them immediately suitable for adoption by United Utilities, ensuring a seamless handover from developer to utility company.

The control panels designed and built by our team are now integral to several large residential building programmes. These panels ensure reliable and efficient operation of critical infrastructure.

BW Controls excels in providing off-site built, regulation-compliant control panel solutions for the construction sector. Whether you are a developer or a business supporting a developer, our expert team is ready to assist in delivering reliable, adoptable infrastructure solutions. For more information, contact us at hello@bwcontrols.co.uk

Share this case study